A selection of mandates across conservation economics and operations. I anonymise client names.
The DRC government sought to create an unprecedented conservation reserve. We built the decree, economic blueprint, and political case — culminating in a Parliamentary vote in January 2025.
Led the full operational and strategic transformation of Virunga Energies — a 42MW hydro utility in North-Kivu — through a period of intense security crisis, raising $13.5m from British International Investments and achieving 20–50% annual revenue growth.
A centralised monitoring and evaluation ledger with a reporting engine on top. Documents dropped in a shared drive become proposed indicator values; two named humans approve before any figure is reportable.
Vast stretches of the Congo River basin — including major cities — had no grid access. We designed the investment programme and structured a joint venture with SNEL, the national electricity operator.
DRC Provinces hosting the Green Corridor needed a carbon finance mechanism that complied with international standards and generated sustainable local revenue. We designed the full scheme architecture under the ART TREES framework.
Virunga's credit portfolio needed to scale without deteriorating — in one of the world's most challenging operating environments. We doubled portfolio size, maintained credit quality, and led the institutional exit to Equity Bank.